# Stoke Space

> Developing Nova, a fully and rapidly reusable medium-lift orbital launch vehicle

## Overview

Stoke Space is a Kent, Washington-based launch vehicle developer founded in 2019 by former Blue Origin propulsion and reusability engineers Andy Lapsa and Tom Feldman. The company is building Nova, a two-stage, fully and rapidly reusable medium-lift orbital rocket designed from the outset for both stages to be recovered, rather than retrofitting reusability onto an expendable design. Its upper stage uses an actively cooled, regeneratively-fed metallic heat shield in place of ablative materials, intended to survive atmospheric re-entry without major refurbishment between flights.

Stoke has progressed through iterative hardware testing, including a 2023 hop test of its upper-stage prototype at Moses Lake, Washington, followed by full-stage integration and testing at its Cape Canaveral, Florida launch site (Launch Complex 14). The company has raised capital in successive rounds — from a $65 million Series A in 2021 through a Series D exceeding $860 million by early 2026 and further capital bringing total disclosed funding to roughly $1 billion — reflecting investor confidence in fully reusable medium-lift launch as a category distinct from both small-lift and heavy-lift incumbents.

Stoke is positioning Nova to compete for NASA science and cargo missions, national security launch contracts (it was added to the U.S. Space Force's National Security Space Launch competitive pool in 2025), and commercial payloads, with first orbital flight targeted for early 2026. The company's work is closely watched as a test of whether full reusability, proven at scale by SpaceX's Falcon 9 booster, can be extended economically to upper stages.

## Products and vehicles

## Nova
Fully and rapidly reusable, two-stage, medium-lift orbital launch vehicle. First stage recovers via powered vertical landing; upper stage uses an actively cooled, regeneratively fed metallic heat shield instead of ablative thermal protection, enabling re-entry and reuse without major refurbishment. Launches from Cape Canaveral Space Force Station, Launch Complex 14.
- Payload to LEO: approximately 7,000 kg (expendable configuration, company-stated)
- Payload to SSO: not publicly specified
- First flight: targeted for early 2026 (not yet flown)
- Success rate: not applicable (pre-flight)

## Upper-Stage Entry, Descent and Landing Technology Demonstrator
Under a 2026 NASA award, Stoke is developing upper-stage entry, descent, and landing technologies to mature reusable upper-stage re-entry capability, building on the Nova upper-stage heat shield approach.

## Track record

- **2019**: Founded by Andy Lapsa and Tom Feldman, both former Blue Origin engineers, to pursue full-vehicle reusability.
- **December 2021**: Closed $65 million Series A round to fund reusable upper-stage development and testing.
- **2023**: Conducted a hop test of the "Hopper2" upper-stage prototype at Moses Lake, Washington, demonstrating vertical takeoff, hover, and landing with the actively cooled engine/heat-shield architecture.
- **October 2023**: Raised $100 million to continue reusable rocket development.
- **January 2025**: Raised $260 million to advance Nova development and its Cape Canaveral launch site.
- **March 2025**: Selected alongside Rocket Lab by the U.S. Space Force to compete for National Security Space Launch contracts.
- **July 2025**: Adjusted target for Nova's first orbital launch from 2025 to early 2026.
- **October 2025**: Raised $510 million in a Series D round to fund operations through first launches.
- **December 2025**: Celestis booked a Nova flight for its second-ever deep-space memorial payload mission, planned for 2026.
- **February 10, 2026**: Extended Series D financing to a total of $860 million.
- **2026**: Raised additional capital bringing total disclosed funding to roughly $1 billion, alongside unveiling plans for a larger launch vehicle.
- **July 6, 2026**: Selected by NASA to develop upper-stage entry, descent, and landing technologies.
- **August 3, 2026**: Announced a 324-acre expansion of its Moses Lake test site, with construction expected to begin later in 2026.

## Roadmap

Stoke Space is targeting Nova's first orbital launch from Cape Canaveral in early 2026, following a 2025 schedule adjustment. The company plans to use its expanded Series D and subsequent funding (totaling roughly $1 billion) to accelerate development of a larger launch vehicle alongside Nova. Under a 2026 NASA award, Stoke will develop upper-stage entry, descent, and landing technologies to further mature reusable upper-stage capability. A 324-acre expansion of its Moses Lake, Washington test site was announced in August 2026, with construction slated to begin later that year. The company is also pursuing qualification for U.S. Space Force National Security Space Launch contracts and has a Celestis memorial spaceflight payload manifested for 2026.

## FAQ

### What does Stoke Space do?

Stoke Space develops Nova, a fully and rapidly reusable two-stage orbital launch vehicle, aiming to recover and reuse both the first and upper stages after flight.

### Who founded Stoke Space?

Stoke Space was founded in 2019 by Andy Lapsa and Tom Feldman, both former Blue Origin engineers.

### Where is Stoke Space headquartered?

Stoke Space is headquartered in Kent, Washington, United States, with a test site in Moses Lake and a launch site at Cape Canaveral, Florida.

### When will Stoke Space launch its first rocket?

Stoke Space is targeting the first orbital launch of its Nova rocket in early 2026, after adjusting the date from an original 2025 target.

### How much funding has Stoke Space raised?

Stoke Space has raised roughly $1 billion across multiple rounds, including a Series D that was extended to $860 million by February 2026.